Maintenance Committee Meeting
2/7/06
Attending:
Fred, Mark, Bob, Bill and Orv
Driveway Update:
Orv reported on progress in getting
attention to the suspicious soil conditions under our driveways. Hopefully a meeting will take place
this spring with all the major players in the DeaconÕs Walk development.
Priority Projects for 2006. The committee agreed on the following priorities for
2006:
- Patio
Problems. Both SturmsÕ and
GusiksÕ concrete patios have heaved and the concrete pads under the steps
need replacing as well. Orv
will contact Cemstone engineering for assistance in developing a solution
and get a quote for the complete removal and replacement of concrete.
- Painting
of wood trim and deck trim.
Bob Miller will write up the requirements for what painting needs
to be done this year. Bill
Aschenbach will conduct a search for painting contractors contacting both
Melinda Johnson and GorhamÕs office for recommendations. Project should be scheduled for
June. Possibly will include
deck trim, front doors and front door and garage door trim and any other
exposed wood trim.
- Driveway
cracks and patching. Other
than the few driveways that have extreme problems and have already been
replaced at least once, our plan is to patch the cracks with an appropriate
cement patch material. We would like to purchase enough containers that
each homeowner with cracking problems could use a Òpatch kitÓ themselves
to repair the damages. The
ÒcommitteeÓ will do those driveways for any who are unwilling to
participate in a volunteer effort.
- Other
topics discussed:
- Replacing
bushes and trees. None
identified at this point
- Pavers
in driveway. Lower priority
to be dealt with after the three top priorities are resolved.
- Foundation
rocks. Deferred until 1 thru
3 are done.
- Irrigation
system. Concierge will bid
on doing the spring turn on, fall blowout and repair of heads on a per
event basis.